CO129-133 - Sir MacDonnell - 1868 [10-12] — Page 167

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

164

ment of Balus & Machinery, that way

part may

110

rot

be easily accessible

Ro

every

het

difficulty may be found in preserving

an

officent state. The Boilus and

of necessity be below the water line.

Two Steam Darkley pumps to be I supplied capable of being

hand also, and to be

worked

ly

arranged) to frump

into the Boilers, on Decke, or over board),

and to draw waln from the bilge

from the sea.

All the mossary ladders for the Engines

legester with Vendas, Guard Rails,

and

floor plates

wvill

As

a re

to be midluded,

As

iron plating for the Peal boxes.

The following Pools and spare Articles are to be supplied

Brushes for boiler tubes Drifts long

Aire

Maw

Mandril

Scrapers

and shout

Spanners and Wrenches.

Spare Gears

Pistar and Red.

Cylinder lid

Hop

20

1 cách

3 Ab

Aroch

Connecting Rod with Strap & Brafin Slide Rods (if so filled).

1;

Springs for each puiston (if we fitted) __ 1.4.1: Pistar plunger Brafics for Douttry Engine: 1.0 Bolt and Hub for Engines. ap?

Washers

100

100

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.